|
Address: Building 2, Yingbin West Road, Yuhuan, Taizhou, Zhejiang, China. |
|
|
Tel:0576-87420908
Fax:0576-87412820 |
|
|
E-mail:taizhou@haochuan.cc |
|
|
|
|
News Details |
|
|
Water heating floor maintenance attention to three major details
|
|
With the continuous improvement of people's living standards, more and more families choose to install the installation of water heating geothermal floor. However, due to the maintenance of hot water floor maintenance requirements, consumers in the pavement, use must pay more attention to detail.
Heating should be step by step. The first use of geothermal heating, should pay attention to slow warming, too fast, the floor may occur due to expansion cracking distortion phenomenon. Long time without using geothermal heating system again, but also like the first use, strictly according to heating procedures.
Pay attention to monitoring indoor humidity. Dry climate in winter, the use of geothermal heating, the floor is at high temperatures to dry, need for humidification, lest floor cracking deformation. Avoid water placed directly on the ground glass and porcelain, so as to avoid the uneven heating, resulting in the "water overflows golden hill".
The ground temperature should not be too high. The use of geothermal heating, the surface temperature should not exceed 28 degrees, water temperature can not exceed 45 degrees centigrade, otherwise it will affect the floor life and use cycle. Home winter temperatures around 22 degrees Celsius has been very comfortable. |
|
>> Return to the previous one |
|