|
Address: Building 2, Yingbin West Road, Yuhuan, Taizhou, Zhejiang, China. |
|
|
Tel:0576-87420908
Fax:0576-87412820 |
|
|
E-mail:taizhou@haochuan.cc |
|
|
|
|
News Details |
|
|
Water heating geothermal floor use and maintenance guidelines
|
|
Today, more and more families choose to install plumbing heating floor when decorating, but because of the maintenance requirements of hot water geothermal floor, consumers shop, must pay more attention to the use of details.
The first use of geothermal heating, should pay attention to slow warming. For the first time, three days before the start of heating to gradually warming up: the first day of the second day temperature of 18 DEG C, 25 C, 30 C for third days, fourth days rose to normal temperature, the temperature of 45 DEG C, the surface temperature of 28 to 30 DEG C. Can not heat up too fast, too fast, the floor may be distorted due to expansion cracking phenomenon. After a long time once again enable the geothermal heating system, but also like the first use, strictly according to heating procedures. Dry climate in winter, plus the use of geothermal heating, the floor is at high temperatures to dry, then the owner is necessary for humidification, lest floor cracking deformation. |
|
>> Return to the previous one |
|